PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Core Drilled at Stair -2.jpg Installed water return piping at the 1st floor Facing North.jpg Installing 2nd floor interior metal framing Facing West.jpg Installing sprinkler branches at the 1st floor Facing North.jpg Layout block at the detention cells Facing West.jpg Low roof storm piping at the 4th floor Facing West.jpg Welding clips at the 1st floor UCIA Lobby Facing South.jpg Block Work at the detention cells Facing West.jpg Core Drilled at Stair -2 2.jpg
Previous pageNext page Layout block at the detention cells Facing West
Layout block at the detention cells Facing West